Valley Clubhouse Update January 14, 2014

Pouring the Retaining Wall on the North Side
North End Retaining wall was poured last week.  Today the precast concrete floor was delivered and installed. Quite a process.  Enjoy the pictures!
Pouring Retaining Wall North Side 




Installing Precast Concrete Floor
Floor Slab Being Placed